From 1 January 2027, Marketing Authorisation renewals in Tunisia must be submitted exclusively in eCTD format. Before that, a baseline of the existing dossier has to be in place.
3 december 2026 | 14:00–15:00 Tunis time (CET)
Held in French
A renewal is only as solid as the dossier it renews
The change in Tunisia is easy to summarise. From 1 January 2027, renewals of Marketing Authorisations must be submitted exclusively in eCTD format, and only after a baseline of the existing dossier has been filed. The format is the visible part of the rule, but the baseline is the part that takes work.
In an eCTD lifecycle, every new submission builds on what has already been submitted. A variation or a renewal refers back to the content that came before it. The first submission in the new format therefore sets the starting point for everything that follows, and the quality of that starting point carries through to every later step.
Where the transition becomes concrete
For many products the existing dossier has been assembled over years, through registrations, variations and updates handled by different teams. Moving it into eCTD means restructuring that content, checking it and validating it, so that the baseline reflects the product as it really is.
This is the step where gaps come to light. A document that is missing, outdated or inconsistent with the approved status is manageable when it is found at the baseline stage. When it is found later, it follows the product through every subsequent variation and renewal, and has to be corrected in a live regulatory lifecycle rather than in a controlled preparation phase.
Three points that shape the outcome
Looking at the transition as a regulatory lifecycle project, three questions decide how smoothly it goes.
What is the baseline for? It is the reliable foundation on which every future submission rests, which is why it deserves the care of a project and not the speed of an administrative task.
What does it take to prepare? Legacy content has to be reviewed, restructured and validated against the existing dossier, with clear ownership for each step. Starting early leaves room for the corrections that a review will inevitably bring.
Where are the critical points? The risks sit in the details that carry forward, such as completeness, consistency and traceability between what was approved and what is filed. Securing them at the baseline is what makes the later lifecycle reliable.
The webinar: eCTD Baseline in Tunisia, Securing the Present, Preparing for the Future
PLG regulatory experts will share practical guidance on the role of the baseline in Tunisia's eCTD transition, the key steps to prepare it and the critical points to secure a reliable regulatory lifecycle.
📅 3 December 2026, 14:00–15:00 Tunis time (CET)
🗣️ Held in French
Speakers
- Camille Pierres, Programme Director, Regulatory Affairs & Operations, Senior CMC Expert
- Yasmine Kallel, International Regulatory Affairs Specialist, Africa & Middle East
- Charlotte Falconet, CMC Specialist, Regulatory Affairs & Operations
Moderator
- Ariana Mina, Programme Director, Global Regulatory Strategy
Behind the baseline
Preparing a baseline brings together regulatory affairs, CMC knowledge and the technical work of formatting and publishing. PLG's Regulatory Affairs and Regulatory Operations teams work on the same dossiers, from publishing to maintenance, so that products stay compliant after approval and the regulatory data remains under the company's control.
Questions about your own dossiers?